infoforbuilding.com - Making it easier to build your home

Construction Forms

Home Building Photos 5

Photo links

Pre-construction/ Phase 1  |  Phase 2  |  Phase 3  |  Phase 4  |  >>Phase 5

P0003904.JPG (127697 bytes)
Light fixtures are installed
Outlets are installed
A basement light is installed.
Permanent power is installed.
The thermostat is installed and tested.
   
Countertops are prepared for sinks and plumbing fixtures are installed.
Heat registers are installed
Hareware such as door handles and locks are installed.
         
       
         
         
         
 
 
          

  

© Copyright 1999-2016 Construction Documents Co. All rights reserved.